May 4, 2009
PLAN COMMISSION
7:00 p.m.
Mike Weinkauf called the meeting to order at 7:00 p.m. with Paul Beere, Maureen
Eckert, Chris Johnson, James Joseph, Tom Rowntree and Mark Tamblyn present.
Betty Novy, Secretary, and Jonathan Schattner, Zoning Administrator, were also
present.
Pledge of Allegiance.
Joseph moved, 2nd by Tamblyn to approve the minutes of the April 6, 2009
meeting. Motion carried.
Petition to rezone Millgate Drive commercial development from B-4 to B-4
with Planned Unit Development Overlay District and submission of General
Development Plan: Lots 1-4, CSM #2790, Volume 8, Page 912
Applicants: Commercial Construction Consultants; Owners: Jim
and Mary Hurst
Parcels 176031911009010; 176031911009020; 176031911009030; 176031911009040
Novy reported on communications with the applicant, zoning administrator and
legal counsel since consideration of a conceptual site plan for a gas station/
convenience store on Lot 2 of the Millgate Development at the previous Plan
Commission meeting. It has since been verified that the
Department of Transportation has no setback authority for this development, but
requests a minimum of 15 feet from the highway. Setback requirements
applicable to underground tanks will be determined by the regulating authority.
The Village Attorney had reported information on other municipal codes. It
was determined that a 55’ setback from State Highway 36 was somewhat excessive
in contrast to other municipalities in the area and that the setback issue would
most likely be recurring if not addressed.
While the proposed gas station is a permitted use in B-4 zoning, strict
implementation of other B-4 zoning requirements would provide difficulty for the
development. Those issues, identified in the applicant’s request for
re-zoning the development to B-4 with a Planned Unit Overlay District (PUD),
include setback, landscaping and sign requirements applicable to the B-4
district.
The June 2007 site plan for the initial development (titled Grading and
Utilities plan) was presented as the General Development Plan, with the
exception that Lot 2 was replaced with the current gas station/ convenience
store site plan (titled Master Grading and Utility Plan- and March 2009) and Lot
4 is currently occupied by a Pro Health Care medical clinic. The plan
included conceptual presentations of a bank on Lot 3 and a multi-tenant
commercial building on Lot 1. Covenants already in place for the
development were also presented for review. All infrastructure
improvements have been completed. A letter of consent for re-zoning from
Pro-Health Care is forthcoming.
Schattner reported staff opinion that re-zoning the Millgate Development with a
PUD overlay is an appropriate answer to address development of all four lots.
Schattner indicated this zoning mechanism allows the Plan Commission to address
individual issues without having to go through the variance process for each
item.
Jim Hurst addressed the Commission. He reported on communication with
Racine County Public Works about utilizing a portion of County Highway D right
of way to meet the 15 foot wide landscape buffer requirement between the
Millgate development and residential properties to the north. Racine County
seemed receptive. He will follow up with them on this issue.
Hurst also reported communicating with Lloyd Frye, the resident directly north
of the entrance to the development, regarding any concerns. Frye did not
express any objections to the gas station/ convenience store proposal.
David Van Winkle, 2540 Hidden Circle, addressed the Commission stating concern
over lining of the gasoline tanks and possible contamination of private wells in
the area. Hurst responded with information on state regulation of gasoline
tanks. He noted all gas tanks must be double walled. Monitoring
equipment is also installed as a mandatory measure against leaks.
Water use by the car wash was also discussed. The system under
consideration utilizes 30 gallons of water per car. Hurst stated an
average homeowner uses 77 gallons if washing their vehicle at home.
Hurst also indicated that silt basins and monitoring manholes will be installed
as required by the Western Racine County Sewerage District.
Joseph moved, 2nd by Johnson to recommend approval of the petition for re-zoning
Lots 1-4 of the Millgate Drive commercial development from B-4 to B-4 with
Planned Unit Development Overlay District and the General Development Plan.
Motion carried.
Specific Implementation Plan to construct and operate a gas station/
convenience store/
car wash at 151 S. Millgate Drive
Applicants: Millgate Development LLC; Owners: Jim and
Mary Hurst
Parcel #176031911009020
Jon Schattner went over site plan zoning review comments outlined in his
memorandum dated April 4, 2009 as follows:
· The first issue regarding compliance with a 55’ setback will be
corrected by re-zoning to PUD.
· The second issue, parking provisions, was re-visited by the zoning
administrator after consulting with legal counsel. By counting parking
spaces near the car wash, minimum parking space requirements are met.
· The third issue regarding restricting the northerly driveway to
exit only was also discussed. Schattner reported the Village engineer did
not object to the driveway being two-way. Hurst indicated the reason for
the north drive is so trucks will not need to back up or perform difficult
maneuvers in order to access the diesel pump island. He asked to be
allowed to try two-way traffic in the north driveway, with a provision that it
be reviewed in 90 days and restricted at that time if problems arise.
· The fourth issue, the landscape plan, indicated requirement of a
15 foot wide landscape buffer between this parcel and residential properties to
the north. Hurst indicated a desire to cluster plantings in specific areas
to mitigate the impact of lights and noise on adjacent residential properties.
Schattner indicated Hurst must provide follow up documentation from Racine
County that they will allow part of the road right of way to be utilized for the
landscape buffer area. The submitted plan also showed retaining wall and
asphalt within a WE Energies easement. The applicant is to provide
verification from WE Energies that this does not contradict restrictions on use
of the easement area. The landscape plan is to be revised to include the
buffer area and proposed plantings.
· The fifth issue, regarding compliance with Historic Preservation
Overlay District regulations was also discussed. Hurst reported on presentation
of a conceptual plan to the Historical Preservation Commission last October.
He will seek formal approval as soon as possible.
· The sixth issue, indicated requirement of a lighting plan.
Hurst indicated site light fixtures will be the same as those currently
installed throughout the development. There will be one
fixture installed along County Highway D and two positioned around the corner of
County Highway D and Millgate Drive. Canopy lighting will be recessed LED
lighting which Hurst indicated is more directional. The building itself
will be lit so that sidewalks and the first row of parking is illuminated.
A lighting plan is to be submitted.
· The seventh issue indicated all signs must be approved by the
Village Plan Commission. Hurst indicated the state regulates what
information is on gasoline station price signs and the height of the letters.
Gasoline companies also require specific signage based on corporate standards.
He indicated this will be a Mobil station and that their logos will have to be
displayed. Schattner indicated signage must be located on the site plan.
It was also noted that signage will have to be approved by the Historic
Preservation Committee.
Novy read Village Engineer review comments offered in his memorandum of April
2nd. All items had been addressed satisfactorily.
Hurst presented architectural drawings of the building. He noted the
building will be of the same character as the Sendiks and Target Stores that
were recently built on Highway 100 in Hales Corners. The interior will be
an open joist design to allow natural light to enter from faux second story
windows.
Proposed interior uses are a delicatessen with sandwiches and a seating area;
and a convenience store. There will be no cooking on site. LP gas
tank sales were discussed as a possibility. However, the Hursts’ indicated
their intent to keep all sales activities within the walls of the building.
Depending on time of day, there will be two to five employees on site.
Hours of operation were stated as 5:00 a.m. – 11:00 p.m. Sunday through
Thursday, and 5:00 a.m. – midnight on Friday and Saturday.
Schattner indicated a loading area must be indicated on the site plan.
Hurst pointed out three potential loading areas. A 30-foot area between
the eastern sidewalk and the gas station canopy will be designated this way on
the plan.
Beere requested that any speaker systems and/or noise generated by machines on
the site be held to a decibel level so that the noise is contained on the
property.
Compliance with Western Racine County Sewerage District (WRCSD) requirements
were discussed. Hurst indicated he will install a grease trap and
monitoring manhole as requested. It was noted projected water use figures
were supplied to WRCSD. The Village will also need this information to
determine appropriate sewer use charges for the facility.
The Fire Department is also to review the plan for any additional comments.
Discussion shifted to the pre-existing residence that straddles Lot 2 and 3 of
the development. The developer is utilizing the residence as a
construction office and asked that it be allowed to remain on the property until
the southerly lot is developed. Schattner indicated this is a violation of
the zoning code as only one principal structure can be on one lot.
Several options were discussed in terms of handling removal of the residence,
such as tying its destruction to within 60 days of occupancy of the gas station.
Another option discussed was that Hurst could adjust the lot line between Lots 2
and 3 to accommodate the residence’s existence until Lot 3 is built on.
Hurst is to determine which option he prefers. This issue must be dealt
with in some way.
Drainage of the site was also discussed. There will be an underground
storm-water system for the canopies and the building. All site drainage
will flow into existing stormwater inlets into the existing storm-water
retention pond just west of the building site.
Financial guarantees for the development were also discussed. Hurst
indicated financing approval cannot be obtained until the Village approves the
development. Plan Commissioners indicated any approval will be conditioned
on proof of a loan commitment from a bank.
Hurst was directed to revise and/or submit additional plans for the June 1st
meeting based on input received at the meeting.
Racine County Comprehensive Plan Open House/ Public Hearing (June 17,
2009)
Reconcile differences between Land Division Ordinance, Zoning Code and Land Use
Plan
Novy reported the Village Board scheduled the public hearing date for the Racine
County Comprehensive Plan for Wednesday, June 17th. An open house
will start at 6:00 p.m., with a public hearing to follow. Racine
County will have staff present to field technical questions. Plan
Commissioners will also need to attend to review and offer a recommendation on
adoption of the plan.
Novy also reported on contact with Dave Schilling of the Southeastern Wisconsin
Regional Planning Commission (SEWRPC) regarding final steps to complete the
Plan. The County’s plan includes all individual municipal plans.
Dave indicated that Rochester needs to reconcile differences between its land
division and zoning ordinances; and the Land Use Plan. The Land Use Plan
specifies three acre density with a 50% open space requirement for divisions of
land classified as “Rural Density Residential and Agricultural Land”. The
Land Division Ordinance specifies three acre average density with no open space
requirement. By the time the Racine County Comprehensive
Plan is adopted, the conflict must be resolved- either by amending the ordinance
or by amending the Land Use Plan. The Village Board indicated their
preference to resolve this matter at their April 27th meeting. Their
preference is to amend the Land Use Plan to reflect requirements of the Land
Division Ordinance.
Joseph moved, 2nd by Johnson to amend the Land Use Plan to reflect the three
acre average density with no open space requirement for lands classified as
“Rural Density Residential and Agricultural Land” in the plan. Motion
carried.
Tamblyn indicated preference that a cutoff date be established for site plan
submittals that is at least ten days in advance of the meeting.
Commissioners concurred and asked that meeting materials be distributed one week
in advance of meeting dates to allow adequate time for review.
Beere moved, 2nd by Tamblyn to adjourn at 10:34 p.m. Motion carried.
Respectfully submitted,
Betty J. Novy, CMC
Plan Commission Secretary